The length of time the house will serve depends, among other things, on the blind area located around. A blind area made of paving slabs. It prevents moisture from entering the foundation and protects it from freezing, preventing its deformation. Let's consider the process of creating a blind area from paving slabs.
There are the following types of blind area:
Packed soil.
Packed on top of the ground, crushed stone.
Concrete mix.
Paving stones or paving slabs.
Paving slabs are ideal as a building material for a blind area. This is due to the fact that:
Firstly, it is an inexpensive option for decorating the area around the building.
Secondly, due to the different tile sizes and a wide range of colors, it is possible to create a unique blind area option.
Thirdly, the laying of tiles can be done independently in the shortest possible time.
When choosing paving slabs, the following considerations should be followed. For a blind area around the house, you need to use vibro-pressed tiles. It is not forged, as it is produced only on industrial equipment. Another type of tile is vibro-cast, which is often forged by fraudsters.
Before laying tiles of different colors, it is recommended to make a preliminary tile placement plan to obtain a suitable pattern. The blind area is normally positioned if the edges of the roof overhang are about 10-20 cm larger.
Laying the blind area
First, the width of the blind area is measured, which is determined by the width of the selected material and curb. The work area is outlined with a tape measure, pegs and twine. A layer of soil of 30-40 cm is removed at the marked place, taking into account the type of soil. It is necessary that the blind area is located at a slight slope to drain water from the building, which should be 2 cm per meter.
Given the type of soil in the cleared area, clay is added. If the soil is clayey, it should be removed less by 5-10 cm. The clay layer on top must be carefully tamped. A waterproofing layer is laid in the trench so that its edges come out on both sides of the trench. Sand 5 cm thick is poured on the waterproofing layer, which is leveled and watered with water.
If necessary, a pipe for draining water is laid in a prepared place. Crushed stone is poured over the sand and leveled. Next, geotextile is laid on the crushed stone, followed by a 10 cm layer of sand. It must be spilled and tamped. Paving slabs are laid on the sand. Further along the outer part of the entire perimeter of the trench, the curb of the future blind area is installed. Thanks to him, the blind area gets a finished look. The curb also restricts the place of installation so that the tiles do not move apart on the slope. Mostbet BD https://mostbet-bangladesh.biz – Online Casino, Sports Betting in Bangladesh.
Paving slabs with your own hands
https://reflexion24informativo.com.mx/con-ayuda-internacional-por-otis-la-amexcid-entrega-cuatro-camiones-de-basura-para-el-puerto-de-acapulco